The History of the Department

1992

Establishment of the Chair of Information Tech-

nology in Mechanical Engineering. This takes into

account the increasing significance of information

technology in mechanical engineering. ‘[Our aim

is] not only to utilise the potential for innovation

connected with the arrival of information technology

in mechanical engineering but to make the problems

which accompany the new technologies controlla-

ble. Only if we succeed in this will our mechanical

engineering be able to maintain its leading position’,

founding professor Klaus Bender emphasises.

1993

The collaborative research centre no. 365 ‘Environ-

mentally Compatible Drive Technology for Vehicles’

is set up headed by Bernd-Robert Höhn. The objec-

tive of this special field of research is the simulation,

layout and design of the Full Hybrid.

1997

Inauguration of the new department building on

the Garching research campus with approximately

60,000 sq. metres floor space.

Garching

The construction of the department’s new campus in Garching

is unique at the time – it is not public building authorities which

carry out the project planning but BMW which is intended

to speed up building. After a construction phase of only six

years – and without exceeding the budget – the new campus

is completed in 1997.

The building is aligned along a central covered axis which

provides access to all chairs, the lecture halls, library,

administration offices and the cafeteria. Its architecture follows

an exact requirement analysis and is optimised for use as a

place of research and study while exceeding the boundaries

of the laws governing the construction of university buildings

in force at the time. Even the students are involved in the

building by designing the seating of the lecture halls. However,

not all plans are implemented. For a while, there were

discussions about setting up a ‘Pilsstube’ (a kind of pub),

directly on the main axis.

The new Audimax under construction, 1992

Demonstration by mechanical engineering students against the

department’s move to Garching in June 1990

Below: Aerial photo of the Department of Mechanical Engineering, 2008